- Marty and Austin assess the site in preparation for installation.
- Austin operating the thinking-man’s end of the surveying operation.
- Austin lifts first tower leg into place using a Cat Telehandler.
- First tower leg set.
- Steve and Marty prepping to receive tower horizontals.
- Tower is raised and the top horizontal is in; Ken and Marty are ready to go to Gils now.
- Austin hauling one of the long mainline cables to its anchor.
- Tower completed and mainlines attached; Marty setting suspender cables.
- Skylines going up.
- Shaped suspender bars hung from the mainlines.
- Steve setting mainlines at the tower top.
- Marty making the first descent along the mainlines; temporary wood frame supports for electrical conduit visible in the foreground.
- Chainfalls, safety lines, and climbing ropes cascade from the bridge tower.
- Austin riding the conduit, newly hung from the skylines.
- Bridge floorbeams waiting to be cast.
- Nephila clavipes, a true expert in web and cable work, assessing our performance.
- Typical mid-project blossoming of cables, straps, utilities, and steel.
- Stringers being cast and installed.
- Ken adjusting skylines at the subtowers.
- The superstructure begins to emerge; stringers and floorbeams in place.
- Ken preparing to transfer conduit to the floorbeams.
- Detail of fixed/pinned stringer connection.
- Tower-top detail; HSI spelter sockets fixed to the tower top.
- Adam fussily lining up marks on the A307 carriage bolt heads. He can do a two hour job in less than six.
- Detail of subtower and approach.
- Subtower with radiused saddle.
- Detail of LED handrail lights.
- The bridge by night; lit with LED handrail lights along its length.
- The Cedar Point Suspension Bridge.
- The Cedar Point Suspension Bridge, Ocean Springs, Mississippi.
- Approach to the bridge via the Marine Education Center.
- Cedar Point Suspension Bridge, illuminated.
- April 17 2018, ribbon-cutting.