- Rigging Preparation.
- Anchor Rods; placed and prepped for bridge installation.
- Abutment with end post base plates being set.
- Martin Walz III pulling mainlines.
- Angula Seo Suspender Bridge, viewed from Deer Creek.
- Suspender to Floorbeam Connection.
- Mainline and suspender bar detail.
- A325 Type 3 Fasteners; connection detail at floor beam.
- Angkula Seo Bridge, viewed from below.
- Decking detail at Abutment.
- Transition Plate detail.
- Suspender Bars / cable details.
- Angkula Seo Bridge Span.
- Angkula Seo Suspender Bridge, 2014.
- Ribbon Cutting Ceremony, Angkula Seo Bridge.
- End Post Detail.
- Suspender bar detail.
- Bridge to Trail Transition.
- Bridge Span.
- Seattle Bridge End Post Plaque, October 2014.