- Breaking ground on abutments at Rock Springs Park.
- Austin Thompson installs a helical pile using a small excavator and our torque motor.
- Austin Thompson and Steve Howell break out the hand tools to clean up one abutment excavation.
- Steve Howell examines the “Plan B” anchor excavation, necessitated by soil refusal of helical piles due to hard clays.
- Ken Gilman and Austin Thompson finish tying rebar cage.
- “Plan B” deadman anchor is completed and ready for concrete placement.
- Pouring concrete for the anchor deadman.
- Compacting soils as we refill the anchor excavation.
- Prepped and ready for concrete placement.
- Steve Howell examines one of the Rock Springs abutments, post-pour.
- Aaron Nelson and Steve Howell strip forms, and shirts, following the abutment pour.
- Aaron Nelson, Austin Thompson, and Ken Gilman perform a construction survey on finished abutments.
- Austin Thompson (driving) and Steve Howell deploy one tower leg for installation.
- Towers and crossbeams are lifted into place on prepared abutments.
- Steve Howell and Ken Gilman complete tower installation.
- Austin Thompson, Ken Gilman, and Steve Howell broom, clean, and socket 1″ bridge rope mainlines.
- Mainline cables are lifted into their towertop saddles.
- Steve Howell, clearly pleased to have wrestled the mainlines into their saddles.
- Chainfalls are used to deploy superstructure material from skylines.
- Suspender bar / floorbeam assemblies are staged prior to installation.
- Ken Gilman, seated in our bosun’s chair, hauls suspender assemblies for attachment to the bridge mainlines.
- Suspender and floorbeam assemblies trace the span of the new superstructure.
- Austin Thompson and Ken Gilman lay stringers between floorbeams.
- Stringers and diagonal wind-bracing cables are installed.
- Austin Thompson and Ken Gilman set deck panels on completed superstructure.
- The Rock Springs Park Suspension Bridge, prior to installation of fencing and rails.
- Rock Springs Suspension Bridge, 2008